C.R. Laurence Co., Inc.
Sign OnSign Off  |  Your Account  |  View Cart  |  Help  |  Home

View Larger Image

Catalog Number: GRP1230V

  • Portable, Light Weight, Compact Delivery System for Rockite™ Cement

  • Dramatically Increases Speed of Application

  • On/Off Control at Point of Delivery
  • Quick and Easy Hose Replacement
  • Operates on 230 Volts AC

  • When CRL decided to enter the Glass Rail market, we went at it in typical CRL fashion and asked the question "How can we improve on the antiquated processes and equipment currently being used to benefit our customers"? So when it came time to look at the way that the Rockite™ Cement was being delivered to the Base Shoe, we knew we had to find a better way. We did just that by developing the CRL Wet Glaze Pump and Accessories.

    CRL Wet Glaze Pump for the HRS System 230v


    Other Products/Finishes/Sizes:

    GRP1 CRL Wet Glaze Pump and Accessories
    GRP1230V CRL Wet Glaze Pump for the HRS System 230v
    GRP2 CRL Replacement Hose Kit for the GRP1

    Catalog Number:GRP1230V
    Also Available in These Catalogs:
    This Item is Not Yet Shown in Any Printed Catalog.
    Ship Via:Can Ship UPS
    Shipping Weight:25 lb (11.34kg)

    The Wet Glaze Pump has been designed to reduce the labor associated with the application of Rockite™ Cement to Hand Rail Base Shoe, and to improve the quality, efficiency, and effectiveness of the final assembly of the Base Shoe and glass. The Wet Glaze Pump not only increases speed of application dramatically, it also offers superior control over the flow rate and delivery location than that of manual applicators.

    This unique delivery system utilizes a pair of rollers fixed to a rotating disk that squeezes the cement through flexible tubing. Since the tubing is the only thing to come in contact with the cement, there are no seals to leak, giving you a virtually maintenance free pump.

    Simply mix your cement in the mixing bucket, insert the end of the Inlet Hose into the mixture, and depress the handy ON/OFF Switch located on the Delivery Nozzle. The Pump will immediately start to move the cement through the hose. Purge any excess water from the hose and release the ON/OFF Switch. You are now ready-to-start pumping cement into the Base Shoe at a rate of 11' (3.3 m) per minute.

    Pump Kit Includes: One Pump with Hoses, One Nozzle, One Momentary ON/OFF Switch, Two 5 Gallon Buckets, Two Measuring Pitchers, One Plastic Scoop, One Mixing Spoon, One GFC1 15A Ground Fault Interrupt Device, and One GRP2 Replacement Hose Kit. (Clamp and Alignment Fixture and Laser not included.)

    Most shipping weights are approximate and have not been verified. If the exact weight is needed in order to determine shipping costs, and shipping costs are required in order for you to complete your order, please request this prior to submitting your order by contacting CRL Customer Service. Product images shown are of the actual product or a close representation. ColorsColours can vary depending on your computer's video card and on how your monitor's colorcolour is adjusted.